Skip to main content
(310) 266-5744★★★★★ 5 (27 reviews)Licensed #1131088No-Obligation Estimates

Kitchen Remodel Overview

Why Choose Buildda?

Buildda kitchen remodel approach:

  • Layout decision happens before demo - We commit to whether plumbing and gas lines move (or stay) before any cabinet comes off the wall. Moving the sink or range adds thousands and weeks; we want that decision finalized at the design stage, not discovered mid-demo.
  • Cabinet, counter, and floor measured as a single set - Cabinet box heights, countertop overhang, and finish-floor thickness all interact at the toe kick and against appliances. We measure them as one stack so the dishwasher fits, the range slides flush, and the counter overhangs land where the design says they should.
  • Permits pulled, sub trades coordinated under license #1131088 - Plumbing, electrical, and HVAC work go to licensed sub trades under Buildda's general (BPC 7057(b)). Inspections are scheduled by us; you don't chase the city. Workmanship is covered for 2 years in writing.

Whether you're planning a complete transformation or targeted improvements, Buildda prioritizes quality at every step. Count on us to deliver results you can be proud of and work to make the experience as smooth as possible.

What's Included in Every Buildda Kitchen Remodel Package

Design Consultation

We discuss your vision, lifestyle needs, and budget to create a personalized kitchen design plan.

Cabinet & Countertop Selection

Access to premium cabinet brands and countertop materials including quartz, granite, and marble.

Complete Installation

Professional installation of cabinets, countertops, backsplash, flooring, lighting, and appliances.

Project Coordination

We manage all plumbing, electrical, and HVAC work required for your remodel.

Ready to Get Started?

Contact us for a no-obligation consultation and detailed estimate. Our team will work with you to understand your needs and provide a comprehensive plan for your project.

Get a Quote
SL
Shiran Levy

Licensed General Contractor · CA #1131088 · Founder, Buildda Inc.

Last updated: April 2026

Share this page:WhatsApp

Buildda Kitchen Remodel Process

Kitchen remodels in LA range from $25,000 for a basic refresh to $200,000+ for a complete renovation, with most projects taking 6-10 weeks once permits are approved. Custom cabinetry lead time (typically 8-12 weeks) is the front-end of the schedule before our on-site work begins.

Timeline: 6-10 weeks, depending on complexity and permits

Step-by-Step Timeline

1

Initial Consultation

We start with a discussion about your kitchen goals -layout changes, storage needs, or a modern upgrade -plus your budget.

Outcome:

A shared vision to kick off your project.

2

Design Selection & Customization

Choose your kitchen style -cabinets, countertops, appliances, and finishes -with Buildda's expert input.

Outcome:

A custom design plan tailored to your space.

3

Site Assessment

Our team inspects your kitchen's plumbing, electrical, and layout to confirm the design's feasibility.

Outcome:

A solid plan accounting for your home's setup.

4

Contract & Cost Review

Buildda delivers a clear contract detailing scope, timeline, and costs -labor, materials, and more.

Outcome:

A signed deal to launch your remodel.

5

Permitting

We secure all required permits to ensure your kitchen meets local codes, especially for plumbing or electrical shifts.

Outcome:

Official approval to begin construction.

6

Preparation

Buildda preps your kitchen -removing old cabinets, protecting floors, and staging materials like countertops and appliances.

Outcome:

A cleared space ready for the transformation.

7

Construction & Installation

We handle demolition, install cabinetry, appliances, and finishes -creating your new kitchen in 3-8 weeks.

Outcome:

A fully functional kitchen taking shape.

8

Final Touches & Inspection

Buildda adds backsplashes, lighting, and details, then tests everything -ensuring it passes inspection.

Outcome:

A complete kitchen, ready and approved.

9

Move-In Ready

We hand over your new kitchen with a walkthrough of features -like that smart oven or hidden pantry.

Outcome:

Your kitchen remodel, complete and yours to enjoy!

See Our Work

Gallery coming soon! Check back for project photos and videos.

Ready to Transform Your Kitchen Remodel?

Let's start with a conversation about your vision and how we can bring it to life.

Kitchen Remodel Reviews

See what kitchen remodel customers have to say.

“Shiran and the Buildda team felt like family from start to finish. Communication was seamless, and the entire process was very smooth. Everything was done so professionally that I never had to worry. I'm beyond grateful...”

CommunicationProfessional

*Individual results may vary.

AC
Abby C.Venice, CA
Google

“I had the pleasure of working with Buildda Construction Company, and I couldn't be more impressed with their work. From start to finish, the team was professional, efficient, and attentive to every detail. They not only...”

ProfessionalQuality

*Individual results may vary.

SG
Sean G.Los Angeles, CA
Google

Transparent Pricing

Kitchen Remodel Pricing

$25,000-$200,000+ Depending on Scope

Kitchen remodels in LA range from $25,000 for a refresh (cabinet refacing or painting + new countertops + hardware) to $200,000+ for a luxury transformation with custom cabinets, premium appliances, and structural changes. Mid-range projects with new semi-custom cabinets and quartz counters typically run $45,000-$85,000. Most projects span 6-10 weeks of on-site work after a 4-6 week cabinet lead time. Permit-required scope (electrical or plumbing rework, structural changes) adds 4-8 weeks for plan check.

A kitchen remodel typically ranges from $25,000 for a basic refresh to $200,000+ for a complete transformation. The single biggest cost decision is layout: keeping plumbing and gas lines where they are is the most efficient remodel; moving the sink or range adds thousands and weeks because we open the slab and inspections cycle. Cost variance comes from cabinet grade (stock < semi-custom < custom; stock cabinets ship in 3-4 weeks, semi-custom in 6-8, full custom in 10-16), countertop material (laminate is cheapest at $30-$60/sf installed; quartz mid-tier $60-$120/sf; natural stone slab $80-$200/sf with seam location and edge profile as add-ons), appliance grade (basic to luxury runs $5,000 to $40,000+ for the bundle), and electrical/plumbing rework which is required when the layout moves. Cabinet box heights, countertop overhang, and finish-floor thickness all interact at the toe kick - we measure them as one stack so the dishwasher fits, the range slides flush, and the counter overhangs land where the design says they should. License #1131088 with permit and inspections handled by us. 2-year workmanship warranty. Below are common project tiers.

Kitchen Remodel Packages

Kitchen Refresh

Price Range

$25,000-$40,000

Includes

Update surfaces without changing layout.

Cabinet refacing or painting, new countertops, updated hardware, new backsplash, fixture updates

Mid-Range Remodel

Price Range

$45,000-$85,000

Includes

New cabinets and appliances, same layout.

Stock or semi-custom cabinets, quartz countertops, new appliances, updated lighting, flooring

Full Kitchen Renovation

Price Range

$100,000-$175,000

Includes

Complete transformation with layout changes.

Custom cabinets, premium countertops, high-end appliances, island addition, electrical/plumbing updates

Luxury Kitchen

Price Range

$200,000+

Includes

Top-tier finishes and custom features.

Custom cabinetry, natural stone, professional-grade appliances, structural changes, smart home integration

Why Choose Buildda?

  • •Can provide strong returns on investment*
  • •Improved functionality and workflow
  • •Energy-efficient modern appliances
  • •Can increase home value*
  • •Enhanced daily living experience
“
Communication was seamless from the initial consultation to the final walkthrough. Everything was done so professionally that I never had to worry.

Abby C.

Kitchen Remodel · Venice, CA

Google Review

*Individual results may vary.

Pricing reflects typical projects in the Los Angeles area as of 2026. Actual quotes vary by site conditions, material lead times, permit requirements, access constraints, and the scope of any structural or substrate repairs uncovered during demolition. We provide a written, itemized estimate only after an on-site walkthrough. License #1131088, 2-year workmanship warranty on every project, in writing.

All prices are estimates. Actual costs vary based on project scope, site conditions, material selections, and permit requirements. Contact us for a personalized quote.

Get Your Kitchen Quote

Schedule a consultation to discuss your kitchen remodel and receive a detailed estimate.

Get a Quote

Frequently Asked Questions

Common questions about kitchen remodeling with Buildda

How long does a kitchen remodel take?

A minor kitchen refresh (paint, hardware, lighting, fixtures) takes 2-4 weeks. A mid-range remodel with new cabinets and countertops typically takes 6-10 weeks. A full renovation with layout changes (moving plumbing, electrical, gas) can run 10-16 weeks. We provide a detailed phased timeline during planning so you know when each stage starts and finishes on the calendar.

Can I use my kitchen during the remodel?

During most of the remodel, your kitchen will be unusable. We recommend setting up a temporary kitchen elsewhere with a microwave, coffee maker, electric kettle, and small refrigerator. Many homeowners use the garage, laundry room, or dining room as the staging area. We minimize disruption by keeping demolition tidy and sealing the kitchen, but plan for 4-12 weeks of takeout and outdoor cooking.

Should I replace or reface my cabinets?

If the cabinet boxes are structurally solid and the existing layout works, refacing (new doors and veneers over the existing boxes) typically costs 30-50% less than full replacement. If the boxes are damaged, the layout is poor, or you want to change the configuration, full replacement is the better long-term investment despite the higher upfront cost. The structural inspection of the boxes is the deciding step.

What countertop material is best?

Quartz is our most-recommended choice: durable, non-porous (does not need sealing), heat-resistant up to a point, and available in dozens of patterns. Granite offers natural variation and excellent heat resistance but needs periodic sealing. Butcher block adds warmth for prep islands but requires regular oiling. Slab porcelain has emerged as a premium option for modern kitchens with large continuous surfaces.

Do I need permits for a kitchen remodel?

Permits are typically required for electrical changes, plumbing relocations, and structural modifications (removing walls, adding a window). Cosmetic updates like paint, hardware, or new countertops usually do not require permits. Buildda handles permit applications, schedules the inspections, and confirms code compliance before any work that triggers an inspection. Permit fees are paid as a passthrough to the city directly.

How much does a kitchen remodel cost?

Kitchen remodels range from $25,000-$40,000 for a refresh (new countertops, cabinet refacing, backsplash), $45,000-$85,000 for a mid-range remodel with new cabinets and appliances, $100,000-$175,000 for a full renovation with layout changes, and $200,000+ for luxury kitchens with custom cabinetry and premium finishes. Appliances alone range from $3,000-$20,000+ depending on quality.

Can you work with my existing layout?

Yes. Many kitchen remodels intentionally maintain the existing layout, which significantly reduces costs by avoiding plumbing and electrical relocation work. We assess whether layout changes would meaningfully improve the kitchen function, but if the current layout already works, keeping it usually delivers more design upgrade per dollar than spending the budget on moving water, gas, and power lines.

What's the best way to add more storage?

Options include taller upper cabinets (going to ceiling instead of stopping at 84 inches), pull-out drawer organizers in lower cabinets, a dedicated pantry cabinet or wall-pantry, an island with deep storage drawers, and corner solutions like lazy Susans or pull-out blind-corner units. We evaluate the household's specific storage pain points and suggest the most effective combinations during the design phase.

See Our Kitchen Remodel Projects

See our kitchen remodel projects come to life

Check out our latest construction project!

View on Instagram

Stay Updated with Our Latest Projects

Follow us on Instagram for daily updates and completed transformations.

Follow @buildda_official

Ready to Start Your Kitchen Remodel Project?

Get your no-obligation quote in just a few minutes. Our team typically responds within 24 business hours.

Serving 5 Counties Across Southern California

We provide professional kitchen remodel services across Los Angeles, Orange, Ventura, Riverside & San Bernardino Counties. Click on your city to see local information and get a no-obligation estimate.

Westside

Mar VistaPalmsDel ReyPlaya Vista
Marina del Rey
WestchesterSanta MonicaVenice
Beverly Hills
West Hollywood
Brentwood
Pacific Palisades
Rancho Park
Cheviot Hills
Century City
Sawtelle
West Los Angeles
Westwood
Playa del Rey

South Bay

Inglewood
Ladera Heights
Baldwin Hills
View Park-Windsor Hills
El Segundo
Hawthorne
Lennox
Text us a photoWhatsApp