Kitchen Remodel Overview

Why Choose Buildda?

Buildda kitchen remodel approach:

  • Layout decision happens before demo - We commit to whether plumbing and gas lines move (or stay) before any cabinet comes off the wall. Moving the sink or range adds thousands and weeks; we want that decision finalized at the design stage, not discovered mid-demo.
  • Cabinet, counter, and floor measured as a single set - Cabinet box heights, countertop overhang, and finish-floor thickness all interact at the toe kick and against appliances. We measure them as one stack so the dishwasher fits, the range slides flush, and the counter overhangs land where the design says they should.
  • Permits pulled, sub trades coordinated under license #1131088 - Plumbing, electrical, and HVAC work go to licensed sub trades under Buildda's general (BPC 7057(b)). Inspections are scheduled by us; you don't chase the city. Workmanship is covered for 2 years in writing.

What's Included in Every Buildda Kitchen Remodel Package

Design Consultation

We discuss your vision, lifestyle needs, and budget to create a personalized kitchen design plan.

Cabinet & Countertop Selection

Access to premium cabinet brands and countertop materials including quartz, granite, and marble.

Complete Installation

Professional installation of cabinets, countertops, backsplash, flooring, lighting, and appliances.

Project Coordination

We manage all plumbing, electrical, and HVAC work required for your remodel.

SL
Shiran Levy

Licensed General Contractor · CA #1131088 · Founder, Buildda Inc.

Buildda Tip

Before deciding whether to reface or replace your cabinets, open them up and check the boxes themselves. If the plywood or particleboard is delaminating, water-damaged, or the hinges are pulling out of soft material, new doors on bad boxes will not hold up. Solid boxes with outdated doors are great candidates for refacing - it can save you a significant amount without sacrificing quality.

What to Know Before You Start

A kitchen remodel in Los Angeles typically costs $25,000-$200,000+ and takes 6-16 weeks depending on scope. A cabinet refresh runs $25,000-$40,000 in about 6 weeks. A full gut renovation with layout changes runs $75,000-$200,000+ over 10-16 weeks.

As your general contractor (CA #1131088, B/General), Buildda coordinates the project; the plumber on your job does plumbing every single day, the electrician does electrical. Real expertise comes from doing one trade every day, not switching between many. The result: a kitchen that works the way your household actually uses it - not a showroom that falls apart in a year.

Buildda Kitchen Remodel Process

Kitchen remodels in LA range from $25,000 for a basic refresh to $200,000+ for a complete renovation, with most projects taking 6-10 weeks once permits are approved. Custom cabinetry lead time (typically 8-12 weeks) is the front-end of the schedule before our on-site work begins.

Typical timeline: 6-10 weeks, depending on complexity and permits

  1. Initial Consultation

    We start with a discussion about your kitchen goals - layout changes, storage needs, or a modern upgrade - plus your budget.

    Outcome: A shared vision to kick off your project.

  2. Design Selection & Customization

    Choose your kitchen style - cabinets, countertops, appliances, and finishes - with Buildda's expert input.

    Outcome: A custom design plan tailored to your space.

  3. Site Assessment

    Our team inspects your kitchen's plumbing, electrical, and layout to confirm the design's feasibility.

    Outcome: A solid plan accounting for your home's setup.

  4. Contract & Cost Review

    Buildda delivers a clear contract detailing scope, timeline, and costs - labor, materials, and more.

    Outcome: A signed deal to launch your remodel.

  5. Permitting

    We secure all required permits to ensure your kitchen meets local codes, especially for plumbing or electrical shifts.

    Outcome: Official approval to begin construction.

  6. Preparation

    Buildda preps your kitchen - removing old cabinets, protecting floors, and staging materials like countertops and appliances.

    Outcome: A cleared space ready for the transformation.

  7. Construction & Installation

    We handle demolition, install cabinetry, appliances, and finishes - creating your new kitchen in 3-8 weeks.

    Outcome: A fully functional kitchen taking shape.

  8. Final Touches & Inspection

    Buildda adds backsplashes, lighting, and details, then tests everything - ensuring it passes inspection.

    Outcome: A complete kitchen, ready and approved.

  9. Move-In Ready

    We hand over your new kitchen with a walkthrough of features - like that smart oven or hidden pantry.

    Outcome: Your kitchen remodel, complete and yours to enjoy!

What You Get

Functional Layout

A well-planned kitchen puts everything within reach. We redesign workflows so prep, cooking, and cleanup happen without fighting the layout.

Home Value

Kitchen remodels are consistently ranked among the strongest home improvement investments for resale. Buyers notice kitchens first.*

Energy Efficiency

Modern appliances, LED lighting, and updated ventilation can reduce your energy use. Newer dishwashers and refrigerators use significantly less water and electricity than older models.

Storage That Makes Sense

Pull-out drawers, taller uppers, pantry cabinets, and corner solutions give you real storage instead of dead space. We design around what you actually store.

Daily Enjoyment

You use your kitchen every single day. Quality countertops, good lighting, and a layout that flows make that daily routine something you look forward to instead of tolerate.

Licensed Professionals

Kitchen remodels involve plumbing, electrical, and sometimes structural work. Our licensed team (CA #1131088) pulls permits and meets all California code requirements.

Reviews From All Our Work

Our kitchen remodel customer and homeowners with bathroom remodel jobs.

“Shiran and the Buildda team felt like family from start to finish. Communication was seamless, and the entire process was very smooth. Everything was done so professionally that I never had to worry. I'm beyond grateful...”

CommunicationProfessional

*Individual results may vary.

AC
Abby C.Venice, CA
Google
Bathroom Remodel

“Buildda recently updated our main bathroom, and the outcome exceeded our expectations. Shiran was great to work with, kind and professional. We are very satisfied with the results! I would definitely recommend.”

QualityProfessional

*Individual results may vary.

NW
Noam W.Santa Monica, CA
Google
Bathroom Remodel

“Excited to be writing this review! Every morning starts with a smile as I walk into my newly remodeled bathroom. Buildda was recommended by my neighboring condo owners and I was very satisfied on the details. I'm a...”

QualityProfessional

*Individual results may vary.

NJ
Nathan J.Culver City, CA
Google

Transparent Pricing

$25,000-$200,000+ Depending on Scope

Kitchen remodels in LA range from $25,000 for a refresh (cabinet refacing or painting + new countertops + hardware) to $200,000+ for a luxury transformation with custom cabinets, premium appliances, and structural changes. Mid-range projects with new semi-custom cabinets and quartz counters typically run $40,000-$75,000. Most projects span 6-10 weeks of on-site work after a 4-6 week cabinet lead time. Permit-required scope (electrical or plumbing rework, structural changes) adds 4-8 weeks for plan check.

A kitchen remodel typically ranges from $25,000 for a basic refresh to $200,000+ for a complete transformation. The single biggest cost decision is layout: keeping plumbing and gas lines where they are is the most efficient remodel; moving the sink or range adds thousands and weeks because we open the slab and inspections cycle. Cost variance comes from cabinet grade (stock < semi-custom < custom; stock cabinets ship in 3-4 weeks, semi-custom in 6-8, full custom in 10-16), countertop material (laminate is cheapest at $30-$60/sf installed; quartz mid-tier $60-$120/sf; natural stone slab $80-$200/sf with seam location and edge profile as add-ons), appliance grade (basic to luxury runs $5,000 to $40,000+ for the bundle), and electrical/plumbing rework which is required when the layout moves. Cabinet box heights, countertop overhang, and finish-floor thickness all interact at the toe kick - we measure them as one stack so the dishwasher fits, the range slides flush, and the counter overhangs land where the design says they should. License #1131088 with permit and inspections handled by us. 2-year workmanship warranty. Below are common project tiers.

Kitchen Remodel Packages

Kitchen Refresh

Price Range

$25,000-$40,000

Includes

Update surfaces without changing layout.

Cabinet refacing or painting, new countertops, updated hardware, new backsplash, fixture updates

Mid-Range Remodel

Price Range

$40,000-$75,000

Includes

New cabinets and appliances, same layout.

Stock or semi-custom cabinets, quartz countertops, new appliances, updated lighting, flooring

Full Kitchen Renovation

Price Range

$75,000-$120,000

Includes

Complete transformation with layout changes.

Custom cabinets, premium countertops, high-end appliances, island addition, electrical/plumbing updates

Luxury Kitchen

Price Range

$120,000-$200,000+

Includes

Top-tier finishes and custom features.

Custom cabinetry, natural stone, professional-grade appliances, structural changes, smart home integration

Pricing reflects typical projects in the Los Angeles area. Actual quotes vary by site conditions, material lead times, permit requirements, access constraints, and the scope of any structural or substrate repairs uncovered during demolition. We provide a written, itemized estimate only after an on-site walkthrough. License #1131088, 2-year workmanship warranty on every project, in writing.

All prices are estimates. Actual costs vary based on project scope, site conditions, material selections, and permit requirements.

Want a price for your project?

Text us about your project, and add a photo if you have one. A real person on our team replies.

What Changes the Price and the Schedule

The price

  • Kitchen size and layout complexity
  • Cabinet type (refacing, stock, semi-custom, custom)
  • Countertop material (laminate, quartz, granite, marble)
  • Appliance quality and brand
  • Plumbing and electrical scope
  • Structural changes (wall removal, island addition)
  • Flooring material and area

The schedule

  • Scope of work (cosmetic refresh vs. full gut)
  • Layout changes requiring plumbing or electrical relocation
  • Custom cabinet lead times (6-10 weeks is common)
  • Permit approval timelines in your jurisdiction
  • Countertop fabrication and templating
  • Structural changes or wall removal

Permits and Inspections

Whether a job like this needs a permit depends on your city and the work; we check the rules for your job before we start. The permits that can apply:

  • Plumbing permit (for sink, dishwasher, or gas line changes)
  • Electrical permit (for new circuits, panel upgrades, or rewiring)
  • Building permit (for structural work like wall removal or island plumbing)
  • Whether cosmetic updates like painting cabinets or new countertops need a permit depends on your city
  • Moving plumbing or gas lines is what cities look at first for permits and inspections
  • Load-bearing wall removal requires engineering and structural permits
  • Buildda handles all permit applications and coordinates inspections

Watch Our Work

Replacing a Rotted Rear Door and Sill in Culver City

Culver City, CA

The rotted old jamb and sill out, the opening cleaned and leveled, a new Masonite half-lite steel door and a Kwikset keypad lock.

New Concrete Driveway, Demo to Broom Finish

Culver City, CA

Old asphalt out, sidewalk cut for the new drain, city signed off

Trim Primer Ready for Paint | Sherwin-Williams Emerald

Culver City, CA

Priming repaired trim and fascia boards with Sherwin-Williams Emerald primer after replacing termite-damaged wood on a Culver City home.

Frequently Asked Questions

Common questions about kitchen remodeling with Buildda

Ask us directly

Have a question about your project? Text it to us, and add a photo if you have one.

How long does a kitchen remodel take?

A minor kitchen refresh (paint, hardware, lighting, fixtures) takes 2-4 weeks. A mid-range remodel with new cabinets and countertops typically takes 6-10 weeks. A full renovation with layout changes (moving plumbing, electrical, gas) can run 10-16 weeks. We provide a detailed phased timeline during planning so you know when each stage starts and finishes on the calendar.

Can I use my kitchen during the remodel?

During most of the remodel, your kitchen will be unusable. We recommend setting up a temporary kitchen elsewhere with a microwave, coffee maker, electric kettle, and small refrigerator. Many homeowners use the garage, laundry room, or dining room as the staging area. We minimize disruption by keeping demolition tidy and sealing the kitchen, but plan for 4-12 weeks of takeout and outdoor cooking.

Should I replace or reface my cabinets?

If the cabinet boxes are structurally solid and the existing layout works, refacing (new doors and veneers over the existing boxes) typically costs 30-50% less than full replacement. If the boxes are damaged, the layout is poor, or you want to change the configuration, full replacement is the better long-term investment despite the higher upfront cost. The structural inspection of the boxes is the deciding step.

What countertop material is best?

Quartz is our most-recommended choice: durable, non-porous (does not need sealing), heat-resistant up to a point, and available in dozens of patterns. Granite offers natural variation and excellent heat resistance but needs periodic sealing. Butcher block adds warmth for prep islands but requires regular oiling. Slab porcelain has emerged as a premium option for modern kitchens with large continuous surfaces.

Do I need permits for a kitchen remodel?

It depends on your city and the work. Electrical changes, plumbing relocations and structural modifications (removing walls, adding a window) are what cities look at; whether cosmetic updates like paint, hardware or new countertops need one also depends on the city. Buildda handles permit applications, schedules the inspections, and confirms code compliance before any work that triggers an inspection. Permit fees are paid as a passthrough to the city directly.

How much does a kitchen remodel cost?

Kitchen remodels range from $25,000-$40,000 for a refresh (new countertops, cabinet refacing, backsplash), $40,000-$75,000 for a mid-range remodel with new cabinets and appliances, $75,000-$120,000 for a full renovation with layout changes, and $120,000-$200,000+ for luxury kitchens with custom cabinetry and premium finishes. Appliances alone range from $3,000-$20,000+ depending on quality.

Can you work with my existing layout?

Yes. Many kitchen remodels intentionally maintain the existing layout, which significantly reduces costs by avoiding plumbing and electrical relocation work. We assess whether layout changes would meaningfully improve the kitchen function, but if the current layout already works, keeping it usually delivers more design upgrade per dollar than spending the budget on moving water, gas, and power lines.

What's the best way to add more storage?

Options include taller upper cabinets (going to ceiling instead of stopping at 84 inches), pull-out drawer organizers in lower cabinets, a dedicated pantry cabinet or wall-pantry, an island with deep storage drawers, and corner solutions like lazy Susans or pull-out blind-corner units. We evaluate the household's specific storage pain points and suggest the most effective combinations during the design phase.

View All Kitchen Remodel FAQs

Ready to Start Your Kitchen Remodel Project?

Start with a text about your project, and add a photo if you have one. A real person on our team replies.

Or call (310) 266-5744, Monday to Saturday.